- Quote #
- Q-SAMPLE-001
- Date
- November 15, 2026
- Valid until
- December 15, 2026
Replace the existing 100A panel with a new 200A main panel, new breakers and grounding, coordinated with the utility and inspected by the city.
| # | Description | Qty | Unit | Unit price | Amount |
|---|---|---|---|---|---|
| 1 | 200A main breaker panel 40-space, copper bus | 1 | ea | $650.00 | $650.00 |
| 2 | Breakers (AFCI/GFCI as required) | 1 | lot | $480.00 | $480.00 |
| 3 | Grounding & bonding upgrade Ground rods, clamps, conductor | 1 | lot | $220.00 | $220.00 |
| 4 | Licensed electrician labor | 12 | hrs | $115.00 | $1,380.00 |
| 5 | Permit & inspection | 1 | ea | $180.00 | $180.00 |
| 6 | Utility disconnect coordination | 1 | ea | $150.00 | $150.00 |
- Coordinate power shutoff with the utility
- Remove old panel and install new 200A panel
- Install breakers and label all circuits
- Upgrade grounding and bonding to code
- Pass city inspection
- Service mast or meter base replacement
- Drywall patching and painting
- Payment: 50% deposit to schedule, balance due on completion
- Warranty: 2-year warranty on workmanship
- This quote is valid for 30 days from the date above.
By signing below, the client accepts this quote and authorizes the work described above.