Free Flooring Estimate Template

Flooring estimates hinge on square footage, waste factor and subfloor prep. Spell them out and your quote looks more professional than the 'one number' competition.

Create my flooring quote free

Your first quote is free — no sign-up. Add your logo, your prices and download a branded PDF.

Example flooring estimate

Prime Floors & More
(555) 010-2030 · office@example.com
QUOTE
Quote #
Q-SAMPLE-001
Date
November 15, 2026
Valid until
December 15, 2026
PREPARED FOR
Sample Client
123 Main St, Your City
PROJECT
Luxury Vinyl Plank – Living Room & Kitchen
Estimated timeline: 3 days

Remove existing carpet and tile and install waterproof luxury vinyl plank across the living room and kitchen with new trim and transitions.

#DescriptionQtyUnitUnit priceAmount
1
Remove carpet & tile, disposal
650sq ft$1.25$812.50
2
Luxury vinyl plank (incl. 8% waste)
20 mil wear layer, waterproof
702sq ft$3.40$2,386.80
3
LVP installation
650sq ft$2.25$1,462.50
4
Subfloor leveling (allowance)
1lot$250.00$250.00
5
Quarter round & transitions
1lot$310.00$310.00
6
Move & replace furniture
1lot$150.00$150.00
Subtotal$5,371.80
TOTAL$5,371.80
Deposit to start (50%)$2,685.90
Balance on completion$2,685.90
Scope of work
  • Remove and dispose of existing flooring
  • Level subfloor where needed
  • Install luxury vinyl plank
  • Install quarter round and transitions
  • Return furniture and clean up
Not included
  • Baseboard replacement
  • Major subfloor repair beyond allowance
Terms
  • Payment: 50% deposit to schedule, balance due on completion
  • Warranty: 1-year installation warranty; manufacturer product warranty
  • This quote is valid for 30 days from the date above.
Acceptance

By signing below, the client accepts this quote and authorizes the work described above.

Client signature — Sample ClientDate
Prime Floors & MoreDate

What to include in a flooring estimate

  • Square footage plus waste factor
  • Flooring product and line
  • Removal of existing floor
  • Subfloor prep and underlayment
  • Transitions, trim and baseboards
  • Furniture moving

Tips from the field

  • Show the waste factor (usually 7–10%) so clients understand the material count.
  • Price subfloor leveling as an allowance.
  • List transitions and quarter round — they're often forgotten.
  • Name the product's wear layer or warranty.
Make this quote yours in 60 seconds

Describe the job and your price. QuoteFlow itemizes it, adds totals and deposit, and gives you a branded PDF.

Try it free

Flooring estimate FAQ

How much waste should a flooring quote include?

Typically 7–10% for straight installs and 15% or more for diagonal or patterned layouts.

Should flooring removal be its own line?

Yes. Removal and disposal vary a lot (carpet vs. glued tile), and listing it separately avoids surprises.

Estimate templates for other trades