Free Remodeling Estimate Template

Remodel quotes cover many trades at once. Group demolition, materials, trade labor and allowances so the client sees where every dollar goes.

Create my remodeling quote free

Your first quote is free — no sign-up. Add your logo, your prices and download a branded PDF.

Example remodeling estimate

Keystone Remodeling
(555) 010-2030 · office@example.com
QUOTE
Quote #
Q-SAMPLE-001
Date
November 15, 2026
Valid until
December 15, 2026
PREPARED FOR
Sample Client
123 Main St, Your City
PROJECT
Guest Bathroom Remodel
Estimated timeline: 2–3 weeks

Full remodel of a 5×8 guest bathroom: new tub surround, vanity, toilet, tile floor, lighting and paint.

#DescriptionQtyUnitUnit priceAmount
1
Demolition & disposal
1lot$950.00$950.00
2
Plumbing rough-in & fixture install
1lot$1,850.00$1,850.00
3
Tile – floor & tub surround
140sq ft$14.00$1,960.00
4
Tile & setting materials (allowance)
1lot$1,100.00$1,100.00
5
Vanity, toilet & fixtures (allowance)
1lot$1,600.00$1,600.00
6
Electrical – lighting & GFCI
1lot$650.00$650.00
7
Drywall repair & paint
1lot$780.00$780.00
8
Permit & inspections
1ea$275.00$275.00
Subtotal$9,165.00
TOTAL$9,165.00
Deposit to start (50%)$4,582.50
Balance on completion$4,582.50
Scope of work
  • Demolish existing bathroom to studs where needed
  • Plumbing and electrical rough-in
  • Tile floor and tub surround
  • Install vanity, toilet, fixtures and lighting
  • Drywall repair, paint and final clean
Not included
  • Moving walls or plumbing locations
  • Finish upgrades beyond allowances (billed as change orders)
Terms
  • Payment: 50% deposit to schedule, balance due on completion
  • Warranty: 1-year warranty on workmanship
  • This quote is valid for 30 days from the date above.
Acceptance

By signing below, the client accepts this quote and authorizes the work described above.

Client signature — Sample ClientDate
Keystone RemodelingDate

What to include in a remodeling estimate

  • Demolition and disposal
  • Materials and finish allowances
  • Trade labor (plumbing, electrical, tile)
  • Permits and inspections
  • Project management
  • Change-order terms

Tips from the field

  • Use allowances for finishes the client hasn't picked yet (tile, fixtures).
  • State your change-order process right in the quote.
  • Break out sub-trade labor so it's comparable to other bids.
  • Set a payment schedule tied to milestones.
Make this quote yours in 60 seconds

Describe the job and your price. QuoteFlow itemizes it, adds totals and deposit, and gives you a branded PDF.

Try it free

Remodeling estimate FAQ

What is an allowance in a remodeling quote?

A budgeted amount for items the client will choose later, like tile or fixtures. If they pick something pricier, the difference becomes a change order.

How should remodel payments be scheduled?

Common practice is a deposit to start, then payments at milestones (demo complete, rough-in passed, completion).

Estimate templates for other trades